SPINBET88 The TP400 development schedule, which was considered very ambitious, had the bench run of the engine targeted for within 27 months (2 years, 3 months) of the contract signing, or August 2005. In spite of Europrop's insistence that testing on a specialized engine testbed aircraft was unnecessary, Airbus pushed for such a program on the Airbus A300 or A340 starting 11 months after the first ground tests. The propeller converts the engine power into 110 kN (11,000 kgf; 25,000 lbf) of thrust. Mraz, Stephen J. (17 February 2005). "Airbus builds a military airlifter: A new, multirole transporter will replace aging heavy-lift aircraft in military fleets". Transportation News. Reuters. Paris, France. Kaiser, Sascha; Donnerhack, Stefan; Lundbladh, Anders; Seitz, Arne (27-29 July 2015). A composite cycle engine concept with hecto-pressure ratio. The difference in the gearbox is the addition of an idler gear so those without the idler gear turn in one direction and those with turn in the opposite direction.|Is Slot Play On Youtube {Worth|Price|Value} [$] To You?