OSAKATOGEL RTP SLOT After 24 hours of ground runs and taxi trials, the first flight of a single TP400-D6 engine took place on 17 December 2008. Airbus and Marshall completed flight testing on the C-130K testbed aircraft completed on 30 September 2009 after 18 flights, 55 flight hours, and 61 hours of ground tests, although the design of the C-130K airframe limited the maximum cruise speed to Mach 0.64 instead of the TP400 propeller's Mach 0.72 maximum. In June 2008, the TP400 had a first ground run on the inboard port wing of the C-130K engine testbed, and integration was completed onto the first A400M production aircraft.|{3|4|5|6|7|8|9|10|Three|Four|Five|Six|Seven|Eight|Nine|Ten} Must-haves Before Embarking On Slot Apk Download